Start with the engineering question. Each application states what is available today and what still needs validation.
Featured applications
Preliminary engineering for approved users
Total RO Design
Set a feed-water basis, size a conventional RO array and inspect membrane performance, hydraulics, energy and a reviewable report.
Inspect stage and element performance against the selected water quality.
Compare pressure, recovery and energy within a stated operating basis.
Carry calculated values and warnings into an engineering record.
Conventional RO preliminary engineering is available to approved users. True Batch, Semi-Batch and energy-recovery paths have separate validation boundaries.