Current capability
- Engineering-preview feed-water and downstream-target basis
- Flexible unit ordering and technology-specific basis fields
- UF/MF screening with CEB/CIP chemical, volume, pump, heater, rinse and spent-solution bookkeeping
Part of the Total Water Design Suite
Build the pretreatment train the water requires.
Feed-water-driven pretreatment basis, downstream protection targets, UF/MF cleaning and future treatment-train workflows.
Sign in to open Total Pretreatment Design → Request accessFeed-water-driven pretreatment basis, downstream protection targets, UF/MF cleaning and future treatment-train workflows.
Design flow, source, temperature, pH, turbidity, TSS, SDI, TOC/DOC, metals, oil, algae risk and downstream targets.
Reviewable train basis, CEB/CIP consumption, preliminary pump/heater duties, rinse and spent-cleaning streams.
Jar/pilot/plant data take precedence; cleaner and removal assumptions remain explicit.
Coming Soon. No generic removal guarantee, cleaner endorsement, final equipment selection or unsupported value is implied.
INTEGRATION ROLE AND MATURITY
Designed to protect downstream processes; treated-water, additions and waste context may be handed off as maturity permits.
3–9 h focused UF/MF cleaning study; 6–20 h conceptual train
Illustrative planning assumption—not a measured customer outcome or guarantee. Actual time depends on project complexity, data quality, current tools, alternatives, review requirements and user experience.
UF/MF CEB/CIP design-basis sample state: planned publication. Validated, sanitized sample artifacts are currently unavailable; publication is planned. No downloadable evidence is implied.
Current engineering-preview UF/MF cleaning basis: 3–9 h focused CEB/CIP study. The 6–20 h conceptual train is planned-engine scope. Planned train elements include coagulation, sludge thickening and filter press.
Current OEM/vendor instructions supersede stored references. No unpublished cleaner is auto-populated; specialty CEB requires product/OEM approval. Project-specific losses control hydraulics, and unsupported removal remains blank or an explicit user assumption.