Total Water Design Suite
Total ZLD Design wordmark In development

Total ZLD Design

Make the brine path visible.

Concentrate management, brine pre-concentration, thermal screening, crystallization and solids pathways.

Status In development · FO/FFE engineering preview and screening

Total ZLD Design main workspace for a fictional serial treatment train
Live alpha workspace · fictional configured train

The design path

From brine basis to a reviewable screen.

  1. 01 · InputsFeed, chemistry and property basis
  2. 02 · CalculationSelected unit train and constraints
  3. 03 · OutputsStreams, duties and warnings
  4. 04 · ReportHTML export from an accepted configured-train run

What you can inspect

See the limits alongside the results.

Total ZLD Design results panel with streams, preliminary duties and validation warnings for a fictional case
Live alpha bounded output · fictional case; zero liquid discharge remains unqualified
  1. Feed and configurationReview the entered chemistry, assumptions and selected unit sequence.
  2. Streams and equipmentInspect preliminary mass balance and each unit's bounded screening results.
  3. Warnings and liquid outletsReview each outlet's unverified disposition and the stated zero-discharge status alongside property, thermal, electrical and model limits.

Current

Development preview project/feed basis, ionic input and mass-balance streams; Forward-osmosis regression model and configurable train state; FFE screening with warnings and preliminary energy/equipment summaries.

Known limitations

In development. FFE correlation is limited to its disclosed range; no full MEE cascade or final mechanical exchanger design.

Development / planned

Arbitrary-order coupled train, multi-effect energy cascade and rigorous high-molality properties; Multi-salt crystallization and optimization after model validation.

Engineering maturity and validation boundariesOpen for assumptions and independent-review requirements.

Status In development · FO/FFE engineering preview and screening

Current capability

  • Development preview project/feed basis, ionic input and mass-balance streams
  • Forward-osmosis regression model and configurable train state
  • FFE screening with warnings and preliminary energy/equipment summaries

Development / planned capability

  • Arbitrary-order coupled train, multi-effect energy cascade and rigorous high-molality properties
  • Multi-salt crystallization and optimization after model validation

What it designs and supported configurations

Concentrate management, brine pre-concentration, thermal screening, crystallization and solids pathways.

  • FO pre-concentration
  • Falling-film evaporator screening
  • Crystallization and recovered-water/solids pathways

Required inputs

Brine flow, composition, concentration target, energy/recycle basis, tube geometry and vendor or user property assumptions.

Main calculated outputs

Screening water/solids/recycle/energy discussion, mass balance, duty, area, tube count and warnings.

Assumptions and defaults

Vendor data, correlation applicability and constraints are stated per case.

Known limitations

In development. FFE correlation is limited to its disclosed range; no full MEE cascade or final mechanical exchanger design.

Integration role and maturity

Selected concentrate or residual streams may form a downstream ZLD basis with preserved provenance and maturity.

Sample-report state

ZLD falling-film evaporator screening sample state: planned publication. Validated, sanitized public samples are currently unavailable. No downloadable evidence is implied.

Illustrative engineering capacity returned

8–28 h ZLD screening and configuration study

Illustrative planning assumption, not a measured customer outcome or guarantee. Actual time depends on project complexity, data quality, current tools, alternatives, review requirements and user experience.

ZLD screening boundaries

FFE screening applies only to 280–305 K, 35,000–95,000 mg/L, Reynolds number 45–90 and Prandtl number 5–10 horizontal-tube conditions. Out-of-range cases require a separately validated design U and are never silently extrapolated. Tube mechanical design is vendor scope; hypersaline or unconventional feeds may need pilot and/or vendor data.

Crystallization is screening only. Supersaturation, growth/nucleation, residence time, solids production, mother-liquor recycle/purge, forced-circulation duty, inhibitor effects and downstream solids require equipment/customer-release validation. Multi-salt behavior and sequence remain under validation. Non-condensables, vacuum, entrainment, vapor body, shell/tubesheet, metallurgy and fabrication are excluded.

Explore the engineering preview · Follow development