Status In development · preliminary economics and finance screening
Current capability
- Administrator-preview Quick Economics workspace with explicit project capital, operating and lifecycle inputs
- Tested development model for CAPEX hierarchy and multi-application summaries
- OPEX reconciliation, lifecycle NPV/LCOW screening and source/maturity context
- Construction spend, funding, reserves, taxes and tariff modelling as preliminary finance model
Development / planned capability
- Shared FX service, automatic project linkage and jurisdiction-specific tax adapters
- Debt sculpting, cash sweep and hedging remain planned
What it designs and supported configurations
Process-scope and project-level CAPEX/OPEX, lifecycle and preliminary finance comparisons with cost ownership and provenance.
- Cost/lifecycle study
- Time-phased finance screen
- Process-to-project cost ownership and provenance
Required inputs
Scenario, energy, consumables, labor, CAPEX/OPEX, dates, currency/source and user financial assumptions.
Main calculated outputs
Transparent cost ownership, lifecycle summaries, preliminary finance metrics and reconciliation context.
Assumptions and defaults
Costs, escalation and operating conditions are user-supplied or explicitly sourced and dated.
Known limitations
In development. Not financial, tax, investment or bankability advice; do not conflate LCOW, tariff, IRR or customer price.
Integration role and maturity
Designed to receive controlled specialist summaries; automatic project linkage is planned.
Sample-report state
Administrator-preview Quick Economics results are shown above for a fictional project-level case; a downloadable published report sample is unavailable. Validated, sanitized public samples are currently unavailable. No downloadable evidence is implied.
Illustrative engineering capacity returned
4–16 h cost/lifecycle study; 8–32 h time-phased finance case
Illustrative planning assumption, not a measured customer outcome or guarantee. Actual time depends on project complexity, data quality, current tools, alternatives, review requirements and user experience.
Economic basis and financial boundary
Use native and reporting currencies with an FX rate, source and snapshot; record estimate date, maturity and case lineage. No silent 1:1 conversion is used. Total Project Cost, Total Capital Requirement, economic LCOW, finance/target-DSCR tariff, customer price, project/equity IRR, and DSCR/LLCR/PLCR remain separate measures.
Specialists own process-scope costs; the project owns project-wide costs. Lifecycle screening differs from advanced development finance. Shared FX, automatic linkage, jurisdiction-specific tax adapters, debt sculpting, cash sweep and hedging remain planned. This is not financial, tax, investment or bankability advice.