Total Water Design Suite
Total Water Balance wordmark In development

Total Water Balance

Know where every cubic metre and component goes.

Plant topology, stream lineage, closure, recycle accounting and facility-level diagnostics without replacing specialist calculations.

Status In development · administrator-preview topology and water accounting

Total Water Balance topology workspace for a fictional one-box water split
Authenticated live alpha workspace · fictional water split

The design path

From entered flows to a reviewable balance.

  1. 01 · InputsApplication boxes and connection flows
  2. 02 · CalculationTopology validation and water accounting
  3. 03 · OutputsClosure, feed, product and waste
  4. 04 · ReportReview scenario closure and the entered basis

What you can inspect

See the limits alongside the results.

Total Water Balance closed balance result with fictional feed, product and waste flows
Authenticated live alpha output · fictional balance closed; topology accounting does not validate specialist-process chemistry or performance
  1. Topology and flow basisReview the application boxes, connection roles and explicit flow inputs.
  2. Water accountingInspect the accounted feed, product and waste flows and the displayed recovery.
  3. Closure and model boundariesReview closure and the entered connection roles. This topology workspace does not validate specialist-process chemistry or treatment performance.

Current

Administrator-preview workspace for entered-flow topology and water accounting; Development balance model for named water streams and process connections; Graph validation, lineage, recycle detection and component/H2O/TOTH closure; Unit/facility residual diagnostics, recovery and fail-closed supported aqueous recycle.

Known limitations

In development. Closure does not validate specialist physics or solve chemistry; unsupported recycle behavior fails closed.

Development / planned

Customer release, Project Library persistence, direct specialist adapters and report provider; Customer release remains deferred.

Engineering maturity and validation boundariesOpen for assumptions and independent-review requirements.

Status In development · administrator-preview topology and water accounting

Current capability

  • Administrator-preview workspace for entered-flow topology and water accounting
  • Development balance model for named water streams and process connections
  • Graph validation, lineage, recycle detection and component/H2O/TOTH closure
  • Unit/facility residual diagnostics, recovery and fail-closed supported aqueous recycle

Development / planned capability

  • Customer release, Project Library persistence, direct specialist adapters and report provider
  • Customer release remains deferred

What it designs and supported configurations

Plant topology, stream lineage, closure, recycle accounting and facility-level diagnostics without replacing specialist calculations.

  • Facility topology
  • Closure and residual diagnostics
  • Recycle/reuse accounting and stream and Sankey view planning

Required inputs

Named streams, flow, component composition, units, process nodes, stream roles and recycle definitions.

Main calculated outputs

Closure, residual, lineage, recovery and water-disposition diagnostics.

Assumptions and defaults

Specialist owners declare transformations; balance model alone does not establish customer availability.

Known limitations

In development. Closure does not validate specialist physics or solve chemistry; unsupported recycle behavior fails closed.

Integration role and maturity

Basis for controlled context as applications mature; customer-facing direct adapters are deferred.

Sample-report state

Administrator-preview scenario closure is shown above for a fictional entered-flow balance; a downloadable published report sample is unavailable. Validated, sanitized public samples are currently unavailable. No downloadable evidence is implied.

Illustrative engineering capacity returned

3–12 h plant-wide balance and reconciliation study

Illustrative planning assumption, not a measured customer outcome or guarantee. Actual time depends on project complexity, data quality, current tools, alternatives, review requirements and user experience.

Water Balance declarations and handoffs

Owners declare sources, sinks, dose and accumulation. The balance identifies closure residuals and does not average pH, infer partitioning, invent mass or hide a non-converged recycle. Supported recycle assumes a pure aqueous stream; unsupported behavior fails closed.

Direct specialist adapters and customer connectivity are planned/deferred. Source Water→Pretreatment is planned; Pretreatment→Membranes/Bio remains a limited development handoff; Membranes/Bio→Reuse awaits validation; concentrate/residual→ZLD is planned. Water Balance preserves declared context without establishing customer connectivity.