TOTAL WATERDESIGN SUITE

THE PLATFORM

Specialist Engineering Without Fragmented Project Context.

The Suite is progressively implementing specialist applications and shared contracts; no universal present-tense integration is implied.

The Shared Project Foundation

Common project, revision, stream, chemistry, assumption and provenance foundations are progressively adopted.

Preserve Meaning at Every Handoff

A controlled handoff may include project/revision, application/version, full-precision stream and chemistry state, solids/phase, assumptions, warnings, maturity, economic summary and provenance. It should not silently refresh, reduce required chemistry to TDS alone or use rounded display values as a calculation state.

Progressive Integration, Clearly Disclosed

Each handoff is labelled available, engineering preview, awaiting validation or planned. Development handoffs do not establish current customer connectivity.

Controlled handoffStateMeaning
Source Water → PretreatmentPlannedBasis exchange is a future customer-facing adapter, not a current connection.
Pretreatment → Membranes/BioEngineering previewControlled engineering context may be reviewed; no automatic customer transfer is implied.
Membranes/Bio → ReuseAwaiting validationReceiving reuse context requires validation before a customer-facing handoff.
Concentrate/residual → ZLDPlannedResidual context is a planned connection, not a current ZLD customer workflow.

The Complete Engineering Workflow Being Built

Source Water → Pretreatment alternatives → specialist treatment → reuse, concentrate or ZLD pathways → balance closure → lifecycle economics → comparison and optimization → versioned report.